CASING PIPE DETAIL

Welded pipe supplier | Carbon Steel Pipe Suppliers

how to choose the right welded Pipe Supplier for your carbon steel Pipe needs When it comes to choosing the…

how to choose the right welded Pipe Supplier for your carbon steel Pipe needs

When it comes to choosing the right welded pipe supplier for your carbon steel pipe needs, it is important to take the time to research and compare different Suppliers. There are many factors to consider when selecting a supplier, such as quality, Price, delivery time, and customer service. Here are some tips to help you find the right welded pipe supplier for your needs.

1. Quality: Quality should be the top priority when selecting a welded pipe supplier. make sure to ask for samples of the supplier’s products and inspect them for any defects. It is also important to ask about the supplier’s quality control processes and certifications.
casing pipe china highgrade supplier,casing pipe China good manufacturer,casing pipe wholesale-price high-quality best China,
2. Price: Price is an important factor when selecting a welded pipe supplier. Make sure to compare prices from different suppliers and look for any discounts or special offers.

Tensile and hardness requirements
Grade     yield strength MPa Tensile Strength Hardness a,c Specified wall thickness Allowable Hardness Variation b
  type Total Elongation Under Load   min MPa max    
      min max   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
h40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
T95 1 0.5 655 758 724 25.4 255 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
C110 0.7 758 828 793 30 286 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b £12.70 3
                12.71 to 19.04 19.05 4
                  5
a In case of dispute, laboratory Rockwell C hardness testing shall be used as the referee method.
b No hardness limits are specified, but the maximum variation is restricted as a manufacturing control in accordance with 7.8 and 7.9.
c For through-wall hardness tests of grades L80 (all types), C90, T95 and C110, the requirements stated in HRC scale are for maximum mean hardness number.
          Calculated Mass c
    Nominal linear Mass T& C b,c Wall Thick- ness       em, Mass Gain or Loss Due to End finishing d
Labels a Outside diameter     Inside Diameter Drift Diameter Plain- end kg
              Round Thread Buttress Thread
            wpe        
  D kg/m t D mm kg/m Short Long RC SCC
  mm   mm mm            
1 2 3 4 5 6 7 8 9 10 11 12
10 3/4 32.75 273.05 48.74 7.09 258.9 254.91 46.5 13.94 — 15.38 — 3.03
10 3/4 40.5 273.05 60.27 8.89 255.3 251.31 57.91 11.91 14.21 1.86
10 3/4 45.5 273.05 67.71 10.16 252.7 250.82 e 248.77 246.23 246.33 65.87 11 14.21 1.86
10 3/4 45.5 273.05 67.71 10.16 252.7 244.48 e 65.87 11 13.05 0.7
10 3/4 51 273.05 75.9 11.43 250.2 244.48 e 243.94 243.94 241.40 241.40 238.86 238.86 234.95 231.80 228.60 73.75 10.11 13.05 0.7
10 3/4 51 273.05 75.9 11.43 250.2   73.75 10.16 f 12.25 –0.09
10 3/4 55.5 273.05 82.59 12.57 247.9   80.75 9.3 12.01 –0.34
10 3/4 55.5 273.05 82.59 12.57 247.9   80.75 9.35 f 12.25 –0.09
10 3/4 55.5 273.05 82.59 12.57 247.9   80.75 9.3 12.01 –0.34
10 3/4 55.5 273.05 82.59 12.57 247.9   80.75 9.35 f 11.07
10 3/4 60.7 273.05 90.33 13.84 245.4   88.47 8.42 10.87
10 3/4 60.7 273.05 90.33 13.84 245.4   88.47 8.47 f 9.98
10 3/4 65.7 273.05 97.77 15.11 242.8   96.12 7.54 9.74
10 3/4 65.7 273.05 97.77 15.11 242.8   96.12 7.60 f
10 3/4 73.2 273.05 108.93 17.07 238.9   107.76
10 3/4 79.2 273.05 117.86 18.64 235.8   116.95
10 3/4 85.3 273.05 126.94 20.24 232.6   126.19    
11 3/4 42 298.45 62.5 8.46 281.5 279.40 e 277.50 275.44 272.39 62.56 13.27
11 3/4 42 298.45 62.5 8.46 281.5 269.88 e 62.56 13.27 — 16.04
11 3/4 47 298.45 69.94 9.52 279.41 269.88 e 67.83 12.42 14.5
11 3/4 54 298.45 80.36 11.05 276.4 269.65 78.32 11.23 13.12
11 3/4 60 298.45 89.29 12.42 273.6 269.65 e 87.61 10.17 13.12
11 3/4 60 298.45 89.29 12.42 273.6 269.88 e 267.36 264.92 87.61 9.77 f 13.12
11 3/4 60 298.45 89.29 12.42 273.6   87.61 10.17 13.12
11 3/4 60 298.45 89.29 12.42 273.6   87.61 9.77 f
11 3/4 65 298.45 96.73 13.56 271.3   95.27
11 3/4 65 298.45 96.73 13.56 271.3   95.27
11 3/4 71 298.45 105.66 14.78 268.9   103.4  

3. Delivery Time: Delivery time is an important factor when selecting a welded pipe supplier. Make sure to ask about the supplier’s delivery times and whether they offer any expedited shipping options.

4. Customer Service: Customer service is an important factor when selecting a welded pipe supplier. Make sure to ask about the supplier’s customer service policies and whether they offer any additional services such as technical support.

By taking the time to research and compare different welded pipe suppliers, you can ensure that you select the right supplier for your carbon steel pipe needs.

alt-2210

Similar Posts