Suppliers casing pipe
how to choose the right casing Pipe Supplier for your Project
When selecting a casing pipe supplier for your project, it is important to consider several factors. Here are some tips to help you choose the right supplier for your project:
1. quality: Quality should be the top priority when selecting a casing pipe supplier. make sure to research the supplier’s reputation and ask for references from previous customers. Check the quality of the pipes they offer and make sure they meet industry standards.
2. Price: Price is an important factor when selecting a casing pipe supplier. Compare prices from different Suppliers and make sure you are getting the best value for your money.
chemical composition, Mass Fraction (%) | ||||||||||||||
grade | C | Mn | Mo | Cr | Ni | Cu | P | S | Si | |||||
type | min | max | min | max | min | max | min | max | max | max | max | max | max | |
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 |
h40 | — | — | — | — | — | — | — | — | — | — | — | — | 0.03 | — |
J55 | — | — | — | — | — | — | — | — | — | — | — | — | 0.03 | — |
K55 | — | — | — | — | — | — | — | — | — | — | — | — | 0.03 | — |
N80 | 1 | — | — | — | — | — | — | — | — | — | — | 0.03 | 0.03 | — |
N80 | Q | — | — | — | — | — | — | — | — | — | — | 0.03 | 0.03 | — |
R95 | — | — | 0.45 c | — | 1.9 | — | — | — | — | — | — | 0.03 | 0.03 | 0.45 |
L80 | 1 | — | 0.43 a | — | 1.9 | — | — | — | — | 0.25 | 0.35 | 0.03 | 0.03 | 0.45 |
L80 | 9Cr | — | 0.15 | 0.3 | 0.6 | 0.9 | 1.1 | 8 | 10 | 0.5 | 0.25 | 0.02 | 0.03 | 1 |
L80 | 13Cr | 0.15 | 0.22 | 0.25 | 1 | — | — | 12 | 14 | 0.5 | 0.25 | 0.02 | 0.03 | 1 |
C90 | 1 | — | 0.35 | — | 1.2 | 0.25 b | 0.85 | — | 1.5 | 0.99 | — | 0.02 | 0.03 | — |
T95 | 1 | — | 0.35 | — | 1.2 | 0.25 b | 0.85 | 0.4 | 1.5 | 0.99 | — | 0.02 | 0.03 | — |
C110 | — | — | 0.35 | — | 1.2 | 0.25 | 1 | 0.4 | 1.5 | 0.99 | — | 0.02 | 0.03 | — |
P110 | e | — | — | — | — | — | — | — | — | — | — | 0.030 e | 0.030 e | — |
Q125 | 1 | — | 0.35 | 1.35 | — | 0.85 | — | 1.5 | 0.99 | — | 0.02 | 0.01 | — | |
NOTE elements shown shall be reported in product analysis. | ||||||||||||||
a The carbon content for L80 may be increased up to 0.50 % maximum if the product is oil-quenched or polymer-quenched. | ||||||||||||||
b The molybdenum content for Grade C90 Type 1 has no minimum tolerance if the wall thickness is less than 17.78 mm. | ||||||||||||||
c The carbon content for R95 may be increased up to 0.55 % maximum if the product is oil-quenched. | ||||||||||||||
d The molybdenum content for T95 Type 1 may be decreased to 0.15 % minimum if the wall thickness is less than 17.78 mm. | ||||||||||||||
e For EW Grade P110, the phosphorus content shall be 0.020 % maximum and the sulfur content 0.010 % maximum. |
Labels a | Calculated Mass c | ||||||||||
Nominal linear Mass T& C b,c | Wall Thick- ness | em, Mass Gain or Loss Due to End finishing d | |||||||||
Outside diameter | Inside Diameter | Drift Diameter | Plain- end | kg | |||||||
Round Thread | Buttress Thread | ||||||||||
wpe | |||||||||||
D | kg/m | t | D | mm | kg/m | Short | Long | RC | SCC | ||
mm | mm | mm | |||||||||
1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 |
8 5/8 | 24 | 219.08 | 35.72 | 6.71 | 205.66 | 202.48 | 35.14 | 10.93 | — | — | — |
8 5/8 | 28 | 219.08 | 41.67 | 7.72 | 203.64 | 200.46 | 40.24 | 10.07 | — 12.44 | — 12.57 | — 2.51 |
8 5/8 | 32 | 219.08 | 47.62 | 8.94 | 201.2 | 200.02 e 198.02 195.58 | 46.33 | 9.39 | 12.44 | 12.57 | 2.51 |
8 5/8 | 32 | 219.08 | 47.62 | 8.94 | 201.2 | 193.68 e | 46.33 | 9.39 | 11.6 | 11.68 | 1.62 |
8 5/8 | 36 | 219.08 | 53.57 | 10.16 | 198.76 | 193.04 | 52.35 | 8.72 | 10.73 | 10.77 | 0.71 |
8 5/8 | 40 | 219.08 | 59.53 | 11.43 | 196.22 | 190.5 | 58.53 | — | 10.73 | 10.77 | 0.71 |
8 5/8 | 40 | 219.08 | 59.53 | 11.43 | 196.22 | 187.6 | 58.53 | — | 9.88 | 9.87 | –0.20 |
8 5/8 | 44 | 219.08 | 65.48 | 12.7 | 193.68 | 64.64 | — | 8.88 | 8.85 | –1.21 | |
8 5/8 | 49 | 219.08 | 72.92 | 14.15 | 190.78 | 71.51 | — | ||||
9 5/8 | 32.3 | 244.48 | 48.07 | 7.92 | 228.6 | 224.66 | 46.2 | 11 | — 14.48 | — 13.87 | — 2.74 |
9 5/8 | 36 | 244.48 | 53.57 | 8.94 | 226.6 | 222.63 | 51.93 | 10.36 | 13.59 | 12.97 | 1.84 |
9 5/8 | 40 | 244.48 | 59.53 | 10.03 | 224.4 | 222.25 e 220.45 218.41 218.41 216.54 216.54 | 57.99 | 9.69 | 13.59 | 12.97 | 1.84 |
9 5/8 | 40 | 244.48 | 59.53 | 10.03 | 224.4 | 215.90 e | 57.99 | 9.69 | 12.78 | 12.15 | 1.01 |
9 5/8 | 43.5 | 244.48 | 64.74 | 11.05 | 222.4 | 215.90 e 212.83 212.83 | 63.61 | — | 12.84 f | 12.15 | 1.01 |
9 5/8 | 43.5 | 244.48 | 64.74 | 11.05 | 222.4 | 212.72 e | 63.61 | — | 12.03 | 11.39 | 0.25 |
9 5/8 | 47 | 244.48 | 69.94 | 11.99 | 220.5 | 212.72 e 210.29 210.29 209.58 206.38 203.23 200.02 | 68.75 | — | 12.09 f | 11.39 | 0.25 |
9 5/8 | 47 | 244.48 | 69.94 | 11.99 | 222.5 | 68.75 | — | 10.57 | 9.92 | –1.22 | |
9 5/8 | 53.5 | 244.48 | 79.62 | 13.84 | 216.8 | 78.72 | — | 10.63 f | 9.92 | –1.22 | |
9 5/8 | 53.5 | 244.48 | 79.62 | 13.84 | 216.8 | 78.72 | — | 10.57 | 9.92 | –1.22 | |
9 5/8 | 53.5 | 244.48 | 79.62 | 13.84 | 216.8 | 78.72 | — | 10.63 f | 9.92 | –1.22 | |
9 5/8 | 53.5 | 244.48 | 79.62 | 13.84 | 216.8 | 78.72 | — | 9.58 | 8.92 | –2.22 | |
9 5/8 | 58.4 | 244.48 | 86.91 | 15.11 | 214.25 | 85.47 | — | 9.65 f | 8.92 | –2.22 | |
9 5/8 | 58.4 | 244.48 | 86.91 | 15.11 | 214.25 | 85.47 | — | 9.58 | 8.92 | –2.22 | |
9 5/8 | 58.4 | 244.48 | 86.91 | 15.11 | 214.25 | 85.47 | — | 9.65 f | 8.92 | –2.22 | |
9 5/8 | 58.4 | 244.48 | 86.91 | 15.11 | 214.25 | 85.47 | — | — | — | — | |
9 5/8 | 59.4 | 244.48 | 88.4 | 15.47 | 213.5 | 87.37 | — | — | — | — | |
9 5/8 | 64.9 | 244.48 | 96.58 | 17.07 | 210.3 | 95.73 | — | — | — | — | |
9 5/8 | 70.3 | 244.48 | 104.62 | 18.64 | 207.2 | 103.82 | — | — | — | — | |
9 5/8 | 75.6 | 244.48 | 112.51 | 20.24 | 204 | 111.93 | — |
3. Delivery: Make sure the supplier can deliver the pipes on time and in the right condition. Ask about their delivery policies and make sure they can meet your project’s timeline.
4. Expertise: Look for a supplier with experience in the type of casing pipe you need. Ask about their experience and make sure they have the necessary expertise to provide the best service.
5. Customer Service: Good customer service is essential when selecting a casing pipe supplier. Make sure the supplier is willing to answer your questions and provide helpful advice.
Oil Tube chinese high-grade wholesaler,casing pipe china good Company,By considering these factors, you can ensure that you select the right casing pipe supplier for your project.