{:en}PIPE 10″ PVC BE WELL CASING SCH 40{:}{:es}TUBO 10″ PVC BE WELL CARCASA SCH 40{:}{:de}ROHR 10″ PVC WELLENGEHÄUSE SCH 40{:}{:fr}TUYAU 10″ PVC BE WELL CASING SCH 40{:}{:it}TUBO 10″ PVC BE WELL CASSA SCH 40{:}{:pl}RURA 10″ PVC BE WELL CASING SCH 40{:}{:hi}पाइप 10″ पीवीसी बीई वेल केसिंग एसएच 40{:}{:th}ท่อ 10″ PVC BE WELL CASING SCH 40{:}{:ko}PIPE 10″ PVC BE WELL CASING SCH 40{:}

{:en} How to Install a 10″ PVC BE WELL CASING SCH 40 for Maximum Durability Installing a 10” PVC BE…

{:en}

How to Install a 10″ PVC BE WELL CASING SCH 40 for Maximum Durability

Installing a 10” PVC BE WELL CASING SCH 40 for maximum durability is a great way to ensure your well is safe and secure. With the right tools and materials, you can easily install this casing in no time. Here’s how:

1. Start by gathering the necessary tools and materials. You’ll need a 10” PVC BE WELL CASING SCH 40, a PVC primer, PVC cement, a hacksaw, a level, a drill, a hammer, and a wrench.

Tensile and Hardness Requirements
Grade     Yield Strength MPa Tensile Strength Hardness a,c Specified Wall Thickness Allowable Hardness Variation b
  Type Total Elongation Under Load   min MPa max    
      min max   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
T95 1 0.5 655 758 724 25.4 255 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
C110 0.7 758 828 793 30 286 £12.70 3
                12.71 to 19.04 4
                19.05 to 25.39 5
                ³ 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b £12.70 3
                12.71 to 19.04 19.05 4
                  5
a In case of dispute, laboratory Rockwell C hardness testing shall be used as the referee method.
b No hardness limits are specified, but the maximum variation is restricted as a manufacturing control in accordance with 7.8 and 7.9.
c For through-wall hardness tests of Grades L80 (all types), C90, T95 and C110, the requirements stated in HRC scale are for maximum mean hardness number.

2. Measure the area where you’ll be installing the casing. Make sure the area is level and free of debris.

3. Cut the casing to the desired length using the hacksaw.

4. Apply the PVC primer to the ends of the casing and the area where it will be installed.

5. Apply the PVC cement to the same areas.

alt-8410

API 5CT L80 Casing Tubing Grade Color Codes
Grade Grade Type Number and Color of Bands for Product a with Length ³ 1.8 m Color(s) for Couplings
      Entire Coupling Band(s) b, c
1 2 3 4 5
H40 None or black band at the manufacturer’s option None Same as for pipe
J55 Tubing One bright green Bright green None
J55 Casing One bright green Bright green One white
K55 Two bright green Bright green None
N80 1 One red Red None
N80 Q One red, one bright green Red Green
R95 One brown Brown None
L80 1 One red, one brown Red One brown
L80 9Cr One red, one brown, two yellow None Two yellow
L80 13Cr One red, one brown, one yellow None One yellow
C90 1 One purple Purple None
T95 1 One silver Silver None
C110 One white, two brown White Two brown
P110 One white White None
Q125 1 One orange Orange None
a In the case of coupling material, unless otherwise specified in the purchase agreement, the manufacturer’s internal requirements shall govern.
b Special clearance couplings shall also have a black band.
c Seal-ring couplings shall also have a blue band.

6. Place the casing in the desired area and use the level to make sure it is level.

7. Secure the casing in place with the drill and hammer.

8. Use the wrench to tighten the screws.

9. Allow the cement to dry for 24 hours before using the well.
oil tube Chinese high-grade wholesaler,casing pipe China good company,
Installing a 10” PVC BE WELL CASING SCH 40 is a great way to ensure your well is safe and secure. With the right tools and materials, you can easily install this casing in no time. So don’t wait any longer, get started on your project today and enjoy the peace of mind that comes with knowing your well is safe and secure.

Benefits of Using 10″ PVC BE WELL CASING SCH 40 for Your Well Casing

{:}{:es}

Cómo instalar una CARCASA BE WELL de PVC SCH 40 de 10″ para una máxima durabilidad

Instalar una CARCASA BE WELL SCH 40 de PVC de 10 para una máxima durabilidad es una excelente manera de garantizar que su pozo esté seguro y protegido. Con las herramientas y materiales adecuados, podrá instalar fácilmente esta carcasa en poco tiempo. He aquí cómo hacerlo:
1. Comience reuniendo las herramientas y materiales necesarios. Necesitará una carcasa de PVC BE WELL CASING SCH 40 de 10 , una imprimación para PVC, cemento para PVC, una sierra para metales, un nivel, un taladro, un martillo y una llave.

Requisitos de tracción y dureza
Grado     Límite elástico MPa Tracción Fuerza Dureza a,c Espesor de pared especificado Dureza permitida Variación b
  Tipo Elongación total bajo carga   MPa mín. máx    
      min máx   HRC HBA mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 P 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12.71 al 19.04 4
                19.05 al 25.39 5
                 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12.71 al 19.04 4
                19.05 al 25.39 5
                 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
                12.71 al 19.04 4
                19.05 al 25.39 5
                 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12.70 3
                12.71 al 19.04 19.05 4
                  5
a En caso de disputa, se utilizará la prueba de dureza Rockwell C en el laboratorio como método de referencia.
b No se especifican límites de dureza, pero la variación máxima está restringida como control de fabricación de acuerdo con 7.8 y 7.9.
c Para pruebas de dureza a través de la pared de Grados L80 (todos los tipos), C90, T95 y C110, los requisitos establecidos en la escala HRC son para el número máximo de dureza media.

2. Mide el área donde instalarás la carcasa. Asegúrese de que el área esté nivelada y libre de escombros.
3. Cortar la carcasa a la longitud deseada con la sierra para metales.
4. Aplicar la imprimación para PVC en los extremos de la carcasa y en la zona donde se instalará.
5. Aplicar el cemento para PVC en las mismas zonas.

alt-8410

Tubo de revestimiento API 5CT L80 Códigos de colores de grado
Grado Tipo de calificación Número y color de bandas para el producto a con longitud  1,8 metros Color(es) para acoplamientos
      Acoplamiento completo Banda(s) b,c
1 2 3 4 5
H40 Ninguno o banda negra a opción del fabricante Ninguno Igual que para la tubería
Tubo J55 Uno verde brillante Verde brillante Ninguno
Carcasa J55 Uno verde brillante Verde brillante Uno blanco
K55 Dos verdes brillantes Verde brillante Ninguno
N80 1 Uno rojo Rojo Ninguno
N80 P Uno rojo, uno verde brillante Rojo Verde
R95 Uno marrón Marrón Ninguno
L80 1 Uno rojo, uno marrón Rojo Uno marrón
L80 9Cr Uno rojo, uno marrón, dos amarillos Ninguno Dos amarillos
L80 13Cr Uno rojo, uno marrón, uno amarillo Ninguno Uno amarillo
C90 1 Uno morado Púrpura Ninguno
T95 1 Uno de plata Plata Ninguno
C110 Uno blanco, dos marrones Blanco Dos marrones
P110 Uno blanco Blanco Ninguno
Q125 1 Una naranja Naranja Ninguno
a En el caso del material de acoplamiento, a menos que se especifique lo contrario en el acuerdo de compra, regirán los requisitos internos del fabricante.
b Los acoplamientos con holgura especial también deberán tener una banda negra.
c Los acoplamientos con anillo de sello también deberán tener una banda azul.

6. Coloca la carcasa en la zona deseada y utiliza el nivel para asegurarte de que esté nivelada.
7. Fijar la carcasa con el taladro y el martillo.
8. Utilice la llave para apretar los tornillos.
9. Deje que el cemento se seque durante 24 horas antes de usar el pozo.
tubo de aceite mayorista chino de alta calidad, tubería de revestimiento China buena compañía,
instalar una carcasa de PVC BE WELL SCH 40 de 10 es una excelente manera de garantizar que su pozo sea seguro y seguro. Con las herramientas y materiales adecuados, podrá instalar fácilmente esta carcasa en poco tiempo. Así que no esperes más, comienza tu proyecto hoy y disfruta de la tranquilidad que conlleva saber que tu pozo está seguro y protegido.

Beneficios de utilizar PVC BE WELL CASING SCH 40 de 10″ para el revestimiento de su pozo

{:}{:de}

So installieren Sie ein 10″ PVC BE WELL CASING SCH 40 für maximale Haltbarkeit

Der Einbau einer 10-Zoll-PVC-BE-Brunnenummantelung SCH 40 für maximale Haltbarkeit ist eine hervorragende Möglichkeit, die Sicherheit Ihres Brunnens zu gewährleisten. Mit den richtigen Werkzeugen und Materialien können Sie dieses Gehäuse im Handumdrehen installieren. So geht’s:
1. Beginnen Sie damit, die notwendigen Werkzeuge und Materialien zusammenzustellen. Sie benötigen ein 10-prozentiges PVC BE WELL CASING SCH 40, eine PVC-Grundierung, PVC-Zement, eine Metallsäge, eine Wasserwaage, einen Bohrer, einen Hammer und einen Schraubenschlüssel.

Zug- und Härteanforderungen
Note     Streckgrenze MPa Zug Stärke Härte a,c Angegebene Wandstärke Zulässige Härte Variante b
  Typ Gesamtdehnung unter Last   min MPa max    
      min max   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12,70 3
                12.71 bis 19.04 4
                19.05 bis 25.39 5
                 25,40 6
T95 1 0.5 655 758 724 25.4 255 12,70 3
                12.71 bis 19.04 4
                19.05 bis 25.39 5
                 25,40 6
C110 0.7 758 828 793 30 286 12,70 3
                12.71 bis 19.04 4
                19.05 bis 25.39 5
                 25,40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12,70 3
                12.71 bis 19.04 19.05 4
                  5
a Im Streitfall wird die Rockwell-C-Härteprüfung im Labor als Referenzmethode verwendet.
b Es sind keine Härtegrenzen festgelegt, die maximale Abweichung ist jedoch als Fertigungskontrolle gemäß 7.8 und 7.9 eingeschränkt.
c Für Härteprüfungen durch die Wand der Klassen L80 (alle Typen), C90, T95 und C110 gelten die in der HRC-Skala angegebenen Anforderungen für die maximale mittlere Härtezahl.

2. Messen Sie den Bereich aus, in dem Sie das Gehäuse installieren möchten. Stellen Sie sicher, dass der Bereich eben und frei von Schmutz ist.
3. Schneiden Sie das Gehäuse mit der Metallsäge auf die gewünschte Länge zu.
4. Tragen Sie die PVC-Grundierung auf die Enden des Gehäuses und den Bereich auf, in dem es installiert werden soll.
5. Tragen Sie den PVC-Zement auf die gleichen Stellen auf.

alt-8410

API 5CT L80 Gehäuseschlauch Grade-Farbcodes
Note Notentyp Anzahl und Farbe der Bänder für das Produkt a mit Länge  1,8 m Farbe(n) für Kupplungen
      Gesamte Kopplung Band(s) b, c
1 2 3 4 5
H40 Kein oder schwarzes Band nach Wahl des Herstellers Keine Gleiches wie für Pipe
J55-Schlauch Ein leuchtendes Grün Hellgrün Keine
J55-Gehäuse Ein leuchtendes Grün Hellgrün Ein Weißer
K55 Zwei leuchtend grüne Hellgrün Keine
N80 1 Ein Rot Rot Keine
N80 Q Ein Rot, ein Hellgrün Rot Grün
R95 Ein Braun Braun Keine
L80 1 Ein Rot, ein Braun Rot Ein Braun
L80 9Cr Ein Rot, ein Braun, zwei Gelb Keine Zwei Gelbe
L80 13Cr Ein Rot, ein Braun, ein Gelb Keine Ein Gelb
C90 1 Ein Lila Lila Keine
T95 1 Ein Silber Silber Keine
C110 Ein Weiß, zwei Braun Weiß Zwei Braune
P110 Ein Weißer Weiß Keine
Q125 1 Eine Orange Orange Keine
a Bei Kupplungsmaterial gelten, sofern im Kaufvertrag nichts anderes vereinbart ist, die herstellerinternen Anforderungen.
b Kupplungen mit besonderem Spiel müssen ebenfalls ein schwarzes Band haben.
c Dichtungsringkupplungen müssen ebenfalls ein blaues Band haben.

6. Platzieren Sie das Gehäuse an der gewünschten Stelle und stellen Sie mit der Wasserwaage sicher, dass es eben ist.
7. Befestigen Sie das Gehäuse mit Bohrer und Hammer.
8. Ziehen Sie die Schrauben mit dem Schraubenschlüssel fest.
9. Lassen Sie den Zement 24 Stunden lang trocknen, bevor Sie das Bohrloch verwenden und sicher. Mit den richtigen Werkzeugen und Materialien können Sie dieses Gehäuse im Handumdrehen installieren. Warten Sie also nicht länger, beginnen Sie noch heute mit Ihrem Projekt und genießen Sie die Gewissheit, dass Ihr Brunnen sicher und geschützt ist.

Vorteile der Verwendung von 10″ PVC BE Well CASING SCH 40 für Ihr Brunnengehäuse

{:}{:fr}

Comment installer un boîtier BE WELL EN PVC SCH 40 de 10″ pour une durabilité maximale

L’installation d’un BE WELL CASING SCH 40 en PVC 10  pour une durabilité maximale est un excellent moyen de garantir la sécurité de votre puits. Avec les bons outils et matériaux, vous pouvez facilement installer ce boîtier en un rien de temps. Voici comment procéder :
1. Commencez par rassembler les outils et le matériel nécessaires. Vous aurez besoin d’un 10 PVC BE WELL CASING SCH 40, d’un apprêt PVC, de colle PVC, d’une scie à métaux, d’un niveau, d’une perceuse, d’un marteau et d’une clé.

Exigences de traction et de dureté
Note     Contrainte d’élasticité MPa Tension Force Dureté a,c Épaisseur de paroi spécifiée Dureté admissible Variante b
  Type Élongation totale sous charge   min MPa maximum    
      min maximum   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12.71 au 19.04 4
                19h05 à 25h39 5
                 25h40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12.71 au 19.04 4
                19h05 à 25h39 5
                 25h40 6
C110 0.7 758 828 793 30 286 12.70 3
                12.71 au 19.04 4
                19h05 à 25h39 5
                 25h40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12.70 3
                12h71 au 19.04 19.05 4
                  5
a En cas de litige, les essais de dureté Rockwell C en laboratoire doivent être utilisés comme méthode d’arbitrage.
b Aucune limite de dureté n’est spécifiée, mais la variation maximale est limitée à titre de contrôle de fabrication conformément à 7.8 et 7.9.
c Pour les essais de dureté à travers la paroi des grades L80 (tous les types), C90, T95 et C110, les exigences indiquées dans l’échelle HRC concernent l’indice de dureté moyen maximum.

2. Mesurez la zone où vous allez installer le boîtier. Assurez-vous que la zone est de niveau et exempte de débris.
3. Coupez le boîtier à la longueur souhaitée à l’aide de la scie à métaux.
4. Appliquer le primaire PVC aux extrémités du caisson et à l’endroit où il sera installé.
5. Appliquer la colle PVC sur les mêmes zones.

alt-8410

Tuyau de boîtier API 5CT L80 Codes de couleur de qualité
Note Type de note Nombre et couleur des bandes pour le produit a avec longueur  1,8 m Couleur(s) pour les accouplements
      Accouplement entier Groupe(s) b, c
1 2 3 4 5
H40 Aucun ou bande noire au choix du fabricant Aucun Idem que pour le tuyau
Tuyau J55 Un vert vif Vert vif Aucun
Boîtier J55 Un vert vif Vert vif Un blanc
K55 Deux vert vif Vert vif Aucun
N80 1 Un rouge Rouge Aucun
N80 Q Un rouge, un vert vif Rouge Vert
R95 Un marron Marron Aucun
L80 1 Un rouge, un marron Rouge Un marron
L80 9Cr Un rouge, un marron, deux jaunes Aucun Deux jaunes
L80 13Cr Un rouge, un marron, un jaune Aucun Un jaune
C90 1 Un violet Violet Aucun
T95 1 Un argent Argent Aucun
C110 Un blanc, deux marron Blanc Deux marrons
P110 Un blanc Blanc Aucun
Q125 1 Une orange Orange Aucun
a Dans le cas du matériau d’accouplement, sauf indication contraire dans le contrat d’achat, les exigences internes du fabricant prévaudront.
b Les accouplements à dégagement spécial doivent également avoir une bande noire.
c Les accouplements à bague d’étanchéité doivent également avoir une bande bleue.

6. Placez le boîtier dans la zone souhaitée et utilisez le niveau pour vous assurer qu’il est de niveau.
7. Fixez le boîtier en place avec la perceuse et le marteau.
8. Utilisez la clé pour serrer les vis.
9. Laissez le ciment sécher pendant 24 heures avant d’utiliser le puits.
tube d’huile grossiste chinois de haute qualité,tuyau de cuvelage Chine bonne entreprise,
L’installation d’un PVC 10 BE WELL CASING SCH 40 est un excellent moyen de garantir la sécurité de votre puits. et sécurisé. Avec les bons outils et matériaux, vous pouvez facilement installer ce boîtier en un rien de temps. Alors n’attendez plus, commencez votre projet dès aujourd’hui et profitez de la tranquillité d’esprit que procure le fait de savoir que votre puits est sûr et sécurisé.

Avantages de l’utilisation de 10″ PVC BE WELL CASING SCH 40 pour le tubage de votre puits

{:}{:it}

Come installare una CASSA BE WELL SCH 40 in PVC da 10″ per la massima durata

Installare una CASSA IN PVC BE WELL SCH 40 da 10 per la massima durata è un ottimo modo per garantire che il tuo pozzo sia sicuro e protetto. Con gli strumenti e i materiali giusti, puoi installare facilmente questo involucro in pochissimo tempo. Ecco come:
1. Inizia raccogliendo gli strumenti e i materiali necessari. Avrai bisogno di un 10 PVC BE WELL CASING SCH 40, un primer per PVC, cemento per PVC, un seghetto, una livella, un trapano, un martello e una chiave inglese.

Requisiti di trazione e durezza
Grado     Carico di snervamento MPa Trazione Forza Durezza a,c Spessore parete specificato Durezza consentita Variazione b
  Tipo Allungamento totale sotto carico   MPamin massimo    
      min massimo   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12.71-19.04 4
                19.05 alle 25.39 5
                 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12.71-19.04 4
                19.05 alle 25.39 5
                 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
                12.71-19.04 4
                19.05 alle 25.39 5
                 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12.70 3
                12.71 alle 19.04 19.05 4
                  5
a In caso di controversia, come metodo di riferimento verrà utilizzato il test di durezza Rockwell C del laboratorio.
b Non sono specificati limiti di durezza, ma la variazione massima è limitata come controllo di produzione in conformità con 7.8 e 7.9.
c Per le prove di durezza attraverso la parete dei gradi L80 (tutti i tipi), C90, T95 e C110, i requisiti indicati nella scala HRC riguardano il numero massimo di durezza media.

2. Misura l’area in cui installerai l’involucro. Assicurarsi che l’area sia piana e priva di detriti.
3. Tagliare l’involucro alla lunghezza desiderata utilizzando il seghetto.
4. Applicare il primer in PVC sulle estremità dell’involucro e sulla zona in cui verrà installato.
5. Applicare il cemento PVC sulle stesse aree.

alt-8410

Tubo involucro API 5CT L80 Codici colore grado
Grado Tipo di voto Numero e colore dei cinturini per il prodotto a con lunghezza  1,8 metri Colore(i) per i giunti
      Intero accoppiamento Banda(i) b,c
1 2 3 4 5
H40 Nessuno o banda nera a scelta del produttore Nessuno Come per il tubo
Tubo J55 Uno verde brillante Verde brillante Nessuno
Carcassa J55 Uno verde brillante Verde brillante Uno bianco
K55 Due verde brillante Verde brillante Nessuno
N80 1 Uno rosso Rosso Nessuno
N80 Q Uno rosso, uno verde brillante Rosso Verde
R95 Uno marrone Marrone Nessuno
L80 1 Uno rosso, uno marrone Rosso Uno marrone
L80 9Cr Uno rosso, uno marrone, due gialli Nessuno Due gialli
L80 13Cr Uno rosso, uno marrone, uno giallo Nessuno Uno giallo
C90 1 Uno viola Viola Nessuno
T95 1 Uno d’argento Argento Nessuno
C110 Uno bianco, due marroni Bianco Due marroni
P110 Uno bianco Bianco Nessuno
Q125 1 Un’arancia Arancione Nessuno
a Nel caso del materiale di accoppiamento, se non diversamente specificato nel contratto di acquisto, prevarranno i requisiti interni del produttore.
b Anche i giunti con gioco speciale devono avere una fascia nera.
c Anche gli accoppiamenti con anello di tenuta devono avere una fascia blu.

6. Posiziona l’involucro nella zona desiderata e usa la livella per assicurarti che sia a livello.
7. Fissare l’involucro in posizione con trapano e martello.
8. Utilizzare la chiave per serrare le viti.
9. Lasciare asciugare il cemento per 24 ore prima di utilizzare il pozzo.
tubo per olio grossista cinese di alta qualità,tubi per rivestimento Cina, buona azienda,
L’installazione di un BE WELL CASING SCH 40 in PVC da 10 è un ottimo modo per garantire che il pozzo sia sicuro e sicuro. Con gli strumenti e i materiali giusti, puoi installare facilmente questo involucro in pochissimo tempo. Quindi non aspettare oltre, inizia oggi stesso il tuo progetto e goditi la tranquillità che deriva dal sapere che il tuo pozzo è sicuro e protetto.

Vantaggi dell’utilizzo dell’INVOLUCRO BE WELL SCH 40 in PVC da 10″ per l’involucro del vostro pozzo

{:}{:pl}

Jak zainstalować 10-calową obudowę BE WELL CASING SCH 40 z PVC, aby uzyskać maksymalną trwałość

Zainstalowanie 10 PCV BE WELL CASING SCH 40 w celu uzyskania maksymalnej trwałości to świetny sposób na zapewnienie bezpieczeństwa studni. Dzięki odpowiednim narzędziom i materiałom możesz łatwo i szybko zamontować tę obudowę. Oto jak:
1. Zacznij od zebrania niezbędnych narzędzi i materiałów. Będziesz potrzebować 10 d PCV BE WELL CASING SCH 40, podkładu do PCV, cementu do PCV, piły do metalu, poziomnicy, wiertarki, młotka i klucza.

Wymagania dotyczące wytrzymałości na rozciąganie i twardości
Ocena     Granica plastyczności MPa Rozciąganie Siła Twardość a,c Określona grubość ścianki Dopuszczalna twardość Odmiana b
  Typ Całkowite wydłużenie pod obciążeniem   min MPa maks.    
      min maks.   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 P 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12,71 do 19,04 4
                19.05 do 25.39 5
                 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12,71 do 19,04 4
                19.05 do 25.39 5
                 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
                12,71 do 19,04 4
                19.05 do 25.39 5
                 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12.70 3
                12,71 do 19,04 19,05 4
                  5
a W przypadku sporu jako metodę referencyjną należy zastosować laboratoryjne badanie twardości Rockwella C.
b Nie określono żadnych ograniczeń twardości, ale maksymalna zmiana jest ograniczona w ramach kontroli produkcyjnej zgodnie z 7.8 i 7.9.
c W przypadku badań twardości ścianek klas L80 (wszystkie typy), C90, T95 i C110, wymagania podane w skali HRC dotyczą maksymalnej średniej twardości.

2. Zmierz powierzchnię, na której będziesz montować obudowę. Upewnij się, że teren jest równy i wolny od zanieczyszczeń.
3. Przytnij osłonkę na żądaną długość za pomocą piły do metalu.
4. Nałóż podkład PCV na końce obudowy i miejsce, w którym będzie ona instalowana.
5. Nałóż cement PCV na te same obszary.

alt-8410

Rura osłonowa API 5CT L80  Kody kolorów stopni
Ocena Typ oceny Liczba i kolor pasków dla produktu a z długością  1,8m Kolor(y) złączy
      Całe sprzęgło Zespół(y) b, c
1 2 3 4 5
H40 Brak lub czarny pasek według uznania producenta Brak Tak samo jak dla rury
Przewód J55 Jeden jasnozielony Jasnozielony Brak
Obudowa J55 Jeden jasnozielony Jasnozielony Jeden biały
K55 Dwa jasnozielone Jasnozielony Brak
N80 1 Jeden czerwony Czerwony Brak
N80 P Jeden czerwony, jeden jasnozielony Czerwony Zielony
R95 Jeden brązowy Brązowy Brak
L80 1 Jeden czerwony, jeden brązowy Czerwony Jeden brązowy
L80 9Cr Jeden czerwony, jeden brązowy, dwa żółte Brak Dwa żółte
L80 13Cr Jeden czerwony, jeden brązowy, jeden żółty Brak Jeden żółty
C90 1 Jeden fioletowy Fioletowy Brak
T95 1 Jedno srebro Srebro Brak
C110 Jeden biały, dwa brązowe Biały Dwa brązowe
P110 Jeden biały Biały Brak
Q125 1 Jedna pomarańcza Pomarańczowy Brak
a W przypadku materiału sprzęgającego, o ile w umowie kupna nie określono inaczej, zastosowanie mają wewnętrzne wymagania producenta.
b Sprzęgła ze specjalnym luzem powinny mieć również czarny pasek.
c Złącza z pierścieniem uszczelniającym powinny mieć również niebieską opaskę.

6. Umieść obudowę w wybranym miejscu i użyj poziomicy, aby upewnić się, że jest wypoziomowana.
7. Zamocuj obudowę za pomocą wiertarki i młotka.
8. Użyj klucza do dokręcenia śrub.
9. Przed użyciem studni pozostaw cement do wyschnięcia na 24 godziny.
rura olejowa chiński wysokiej jakości hurtownik,rury osłonowe z Chin, dobra firma,
Instalacja 10 PVC BE WELL CASING SCH 40 to świetny sposób na zapewnienie bezpieczeństwa studni i bezpieczne. Dzięki odpowiednim narzędziom i materiałom możesz łatwo i szybko zamontować tę obudowę. Więc nie czekaj dłużej, rozpocznij swój projekt już dziś i ciesz się spokojem ducha, wiedząc, że Twoja studnia jest bezpieczna.

Korzyści ze stosowania 10-calowej obudowy BE WELL CASING SCH 40 z PVC w obudowie studni

{:}{:hi}

अधिकतम स्थायित्व के लिए 10″ पीवीसी बीई वेल केसिंग SCH 40 कैसे स्थापित करें

अधिकतम स्थायित्व के लिए 10 पीवीसी बीई वेल केसिंग SCH 40 स्थापित करना यह सुनिश्चित करने का एक शानदार तरीका है कि आपका कुआं सुरक्षित और संरक्षित है। सही उपकरण और सामग्री के साथ, आप इस आवरण को कुछ ही समय में आसानी से स्थापित कर सकते हैं। यहां बताया गया है कि कैसे:
1. आवश्यक उपकरण और सामग्री इकट्ठा करके शुरुआत करें। आपको 10 d पीवीसी बीई वेल केसिंग SCH 40, एक पीवीसी प्राइमर, पीवीसी सीमेंट, एक हैकसॉ, एक लेवल, एक ड्रिल, एक हथौड़ा और एक रिंच की आवश्यकता होगी।

तन्यता और कठोरता आवश्यकताएँ
ग्रेड उपज शक्ति एमपीए तन्य ताकत कठोरता ए,सी निर्दिष्ट दीवार की मोटाई स्वीकार्य कठोरता भिन्नता b
प्रकार लोड के तहत कुल बढ़ाव मिनट एमपीए अधिकतम
मिनट अधिकतम एचआरसी HBW मिमी एचआरसी
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 Q 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9 करोड़ 13 करोड़ 0.5 552 655 655 23 241
0.5 552 655 655 23 241
सी90 1 0.5 621 724 689 25.4 255 12.70 3
12.71 से 19.04 4
19.05 से 25.39 5
 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
12.71 से 19.04 4
19.05 से 25.39 5
 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
12.71 से 19.04 4
19.05 से 25.39 5
 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 b 12.70 3
12.71 से 19.04 19.05 4
5
ए विवाद की स्थिति में, प्रयोगशाला रॉकवेल सी कठोरता परीक्षण का उपयोग रेफरी विधि के रूप में किया जाएगा।
बी कोई कठोरता सीमा निर्दिष्ट नहीं है, लेकिन अधिकतम भिन्नता 7.8 और 7.9 के अनुसार विनिर्माण नियंत्रण के रूप में प्रतिबंधित है।
सी ग्रेड एल80 (सभी प्रकार), सी90, टी95 और सी110 के थ्रू-वॉल कठोरता परीक्षणों के लिए, एचआरसी पैमाने में बताई गई आवश्यकताएं अधिकतम औसत कठोरता संख्या के लिए हैं।

2. उस क्षेत्र को मापें जहां आप आवरण स्थापित करेंगे। सुनिश्चित करें कि क्षेत्र समतल और मलबे से मुक्त है।
3. हैकसॉ का उपयोग करके आवरण को वांछित लंबाई में काटें।
4. पीवीसी प्राइमर को आवरण के सिरों और उस क्षेत्र पर लगाएं जहां इसे स्थापित किया जाएगा।
5. उन्हीं क्षेत्रों में पीवीसी सीमेंट लगाएं।

alt-8410

एपीआई 5सीटी एल80 केसिंग टयूबिंगग्रेड रंग कोड
ग्रेड ग्रेड प्रकार उत्पाद के लिए बैंड की संख्या और रंग लंबाई के साथ 1.8 मीटर कपलिंग के लिए रंग
संपूर्ण युग्मन बैंड बी, सी
1 2 3 4 5
H40 कोई नहीं या निर्माता के विकल्प पर काली पट्टी कोई नहीं पाइप के समान
J55 ट्यूबिंग एक चमकीला हरा चमकीला हरा कोई नहीं
J55 आवरण एक चमकीला हरा चमकीला हरा एक सफेद
K55 दो चमकीले हरे चमकीला हरा कोई नहीं
N80 1 एक लाल लाल कोई नहीं
N80 Q एक लाल, एक चमकीला हरा लाल हरा
R95 एक भूरा भूरा कोई नहीं
L80 1 एक लाल, एक भूरा लाल एक भूरा
L80 9 करोड़ एक लाल, एक भूरा, दो पीला कोई नहीं दो पीले
L80 13Cr एक लाल, एक भूरा, एक पीला कोई नहीं एक पीला
सी90 1 एक बैंगनी बैंगनी कोई नहीं
T95 1 एक चांदी रजत कोई नहीं
C110 एक सफेद, दो भूरे सफ़ेद दो भूरे
P110 एक सफेद सफ़ेद कोई नहीं
Q125 1 एक नारंगी नारंगी कोई नहीं
ए युग्मन सामग्री के मामले में, जब तक कि खरीद समझौते में अन्यथा निर्दिष्ट न हो, निर्माता की आंतरिक आवश्यकताएं नियंत्रित होंगी।
b विशेष क्लीयरेंस कपलिंग पर एक काली पट्टी भी होनी चाहिए।
c सील-रिंग कपलिंग में एक नीला बैंड भी होगा।

6. आवरण को वांछित क्षेत्र में रखें और यह सुनिश्चित करने के लिए लेवल का उपयोग करें कि यह समतल है।
7. ड्रिल और हथौड़े से आवरण को उसकी जगह पर सुरक्षित करें।
8. पेंच कसने के लिए रिंच का प्रयोग करें
9. कुएं का उपयोग करने से पहले सीमेंट को 24 घंटे तक सूखने दें। और सुरक्षित. सही उपकरण और सामग्री के साथ, आप इस आवरण को कुछ ही समय में आसानी से स्थापित कर सकते हैं। तो अब और इंतजार न करें, आज ही अपने प्रोजेक्ट पर काम शुरू करें और मन की शांति का आनंद लें जो यह जानकर मिलती है कि आपका कुआं सुरक्षित है।

आपके वेल केसिंग के लिए 10″ पीवीसी बीई वेल केसिंग SCH 40 का उपयोग करने के लाभ

{:}{:th}

วิธีการติดตั้ง PVC BE WELL CASING SCH 40 ขนาด 10 นิ้ว เพื่อความทนทานสูงสุด

การติดตั้ง 10 PVC BE WELL CASING SCH 40 เพื่อความทนทานสูงสุดเป็นวิธีที่ดีเยี่ยมในการรับประกันบ่อน้ำของคุณให้ปลอดภัย ด้วยเครื่องมือและวัสดุที่เหมาะสม คุณสามารถติดตั้งเคสนี้ได้อย่างง่ายดายในเวลาไม่นาน วิธีการมีดังนี้
1. เริ่มต้นด้วยการรวบรวมเครื่องมือและวัสดุที่จำเป็น คุณจะต้องมี 10 PVC BE WELL CASING SCH 40, สีรองพื้น PVC, ซีเมนต์ PVC, เลื่อยเลือยตัดโลหะ, เครื่องวัดระดับ, สว่าน, ค้อน และประแจ

ข้อกำหนดด้านแรงดึงและความแข็ง
เกรด     ความแข็งแรงของผลผลิต MPa แรงดึง ความแข็งแกร่ง ความแข็ง ก,ค ความหนาของผนังที่ระบุ ความแข็งที่อนุญาต รูปแบบ
  ประเภท การยืดตัวรวมภายใต้โหลด   ต่ำสุด MPa สูงสุด    
      นาที สูงสุด   เหล็กแผ่นรีดร้อน HBW มม. เหล็กแผ่นรีดร้อน
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 ถาม 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12.71 ถึง 19.04 4
                19.05 ถึง 25.39 5
                 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12.71 ถึง 19.04 4
                19.05 ถึง 25.39 5
                 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
                12.71 ถึง 19.04 4
                19.05 ถึง 25.39 5
                 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 12.70 3
                12.71 ถึง 19.04 19.05 4
                  5
a ในกรณีที่มีข้อโต้แย้ง ให้ใช้การทดสอบความแข็ง Rockwell C ในห้องปฏิบัติการเป็นวิธีตัดสิน
b ไม่มีการระบุขีดจำกัดความแข็ง แต่ความแปรผันสูงสุดถูกจำกัดไว้เป็นการควบคุมการผลิตตามข้อ 7.8 และ 7.9
c สำหรับการทดสอบความแข็งทะลุผนังของเกรด L80 (ทุกประเภท), C90, T95 และ C110 ข้อกำหนดที่ระบุไว้ในมาตราส่วน HRC มีไว้สำหรับค่าความแข็งเฉลี่ยสูงสุด

2. วัดพื้นที่ที่คุณจะติดตั้งปลอก ตรวจสอบให้แน่ใจว่าพื้นที่เรียบและไม่มีเศษซาก
3. ตัดปลอกให้ได้ความยาวที่ต้องการโดยใช้เลื่อยเลือยตัดโลหะ
4. ทาไพรเมอร์ PVC ที่ปลายท่อและพื้นที่ที่จะติดตั้ง
5. ทาปูนพีวีซีให้ทั่วบริเวณเดียวกัน

alt-8410

ท่อปลอก API 5CT L80 รหัสสีเกรด
เกรด ประเภทเกรด จำนวนและสีของสายสำหรับผลิตภัณฑ์ a พร้อมความยาว  1.8 ม. สีสำหรับข้อต่อ
      ข้อต่อทั้งหมด วงดนตรี ข, ค
1 2 3 4 5
H40 ไม่มีหรือแถบสีดำตามตัวเลือกของผู้ผลิต ไม่มี เช่นเดียวกับไปป์
ท่อ J55 สีเขียวสดใสหนึ่งอัน สีเขียวสดใส ไม่มี
ปลอก J55 สีเขียวสดใสหนึ่งอัน สีเขียวสดใส สีขาวหนึ่งอัน
K55 สองสีเขียวสดใส สีเขียวสดใส ไม่มี
N80 1 สีแดงหนึ่งอัน สีแดง ไม่มี
N80 ถาม สีแดงหนึ่งอัน สีเขียวสดใสหนึ่งอัน สีแดง สีเขียว
R95 สีน้ำตาลหนึ่งอัน สีน้ำตาล ไม่มี
L80 1 แดงหนึ่งอัน น้ำตาลหนึ่งอัน สีแดง สีน้ำตาลหนึ่งอัน
L80 9Cr สีแดงหนึ่ง สีน้ำตาลหนึ่ง สีเหลืองสอง ไม่มี สองสีเหลือง
L80 13Cr แดงหนึ่งอัน น้ำตาลหนึ่งอัน และเหลืองหนึ่งอัน ไม่มี สีเหลืองหนึ่งอัน
C90 1 หนึ่งสีม่วง สีม่วง ไม่มี
T95 1 หนึ่งเงิน สีเงิน ไม่มี
C110 ขาวหนึ่งอัน น้ำตาลสองอัน สีขาว สองสีน้ำตาล
P110 สีขาวหนึ่งอัน สีขาว ไม่มี
Q125 1 ส้มหนึ่งลูก สีส้ม ไม่มี
a ในกรณีของวัสดุข้อต่อ เว้นแต่จะระบุไว้เป็นอย่างอื่นในข้อตกลงการซื้อ ข้อกำหนดภายในของผู้ผลิตจะควบคุม
b คัปปลิ้งระยะห่างพิเศษต้องมีแถบสีดำด้วย
c ข้อต่อวงแหวนซีลจะต้องมีแถบสีน้ำเงินด้วย

6. วางปลอกในบริเวณที่ต้องการและใช้ระดับเพื่อให้แน่ใจว่าได้ระดับ
7. ยึดเคสให้เข้าที่ด้วยสว่านและค้อน
8. ใช้ประแจขันสกรูให้แน่น
9. ปล่อยให้ซีเมนต์แห้งเป็นเวลา 24 ชั่วโมงก่อนใช้งานบ่อ
ท่อน้ำมันผู้ค้าส่งคุณภาพสูงของจีน ท่อปลอกท่อ บริษัทที่ดีในจีน
การติดตั้ง PVC 10 BE WELL CASING SCH 40 เป็นวิธีที่ดีในการรับประกันว่าบ่อน้ำของคุณปลอดภัย และปลอดภัย ด้วยเครื่องมือและวัสดุที่เหมาะสม คุณสามารถติดตั้งเคสนี้ได้อย่างง่ายดายในเวลาไม่นาน ดังนั้นอย่ารออีกต่อไป เริ่มโครงการของคุณวันนี้และเพลิดเพลินไปกับความอุ่นใจที่มาพร้อมกับการรู้ว่าบ่อน้ำของคุณปลอดภัย

ประโยชน์ของการใช้ PVC ขนาด 10 นิ้ว BE WELL CASING SCH 40 สำหรับปลอกบ่อของคุณ

{:}{:ko}

최대 내구성을 위한 10″ PVC BE WELL CASING SCH 40 설치 방법

최대한의 내구성을 위해 10 PVC BE WELL CASING SCH 40을 설치하는 것은 우물을 안전하게 보호할 수 있는 좋은 방법입니다. 올바른 도구와 재료를 사용하면 이 케이스를 즉시 쉽게 설치할 수 있습니다. 방법은 다음과 같습니다.
1. 필요한 도구와 재료를 모으는 것부터 시작하세요. 10 d PVC BE WELL CASING SCH 40, PVC 프라이머, PVC 시멘트, 쇠톱, 레벨, 드릴, 해머, 렌치가 필요합니다.

인장력 및 경도 요건
등급     항복강도 MPa 인장 강도 경도 a,c 지정된 벽 두께 허용 경도 변형
  종류 하중을 받는 총 신율   최소 MPa 최대    
      최대   HRC HBW mm HRC
1 2 3 4 5 6 7 8 9 10
H40 0.5 276 552 414
J55 0.5 379 552 517
K55 0.5 379 552 655
N80 1 0.5 552 758 689
N80 질문 0.5 552 758 689
R95 0.5 655 758 724
L80 L80 1 0.5 552 655 655 23 241
L80 9Cr 13Cr 0.5 552 655 655 23 241
    0.5 552 655 655 23 241
C90 1 0.5 621 724 689 25.4 255 12.70 3
                12.71~19.04 4
                19.05~25.39 5
                 25.40 6
T95 1 0.5 655 758 724 25.4 255 12.70 3
                12.71~19.04 4
                19.05~25.39 5
                 25.40 6
C110 0.7 758 828 793 30 286 12.70 3
                12.71~19.04 4
                19.05~25.39 5
                 25.40 6
P110 0.6 758 965 862
Q125 1 0.65 862 1034 931 12.70 3
                12.71~19.04 19.05 4
                  5
a 분쟁이 있는 경우, 실험실의 Rockwell C 경도 시험을 심판 방법으로 사용해야 합니다.
b 경도한계는 명시되어 있지 않으나 7.8 및 7.9에 따라 제조관리상 최대변동이 제한된다.
c 등급 L80(모든 유형), C90, T95 및 C110의 벽 관통 경도 시험의 경우 HRC 척도에 명시된 요구 사항은 최대 평균 경도 수치에 대한 것입니다.

2. 케이싱을 설치할 영역을 측정하세요. 해당 지역이 수평이고 잔해물이 없는지 확인하세요.
3. 쇠톱을 사용하여 케이싱을 원하는 길이로 자릅니다.
4. 케이싱 끝부분과 설치될 부위에 PVC 프라이머를 도포합니다.
5. 같은 부위에 PVC 시멘트를 도포합니다.

alt-8410

API 5CT L80 케이싱 튜빙 등급 색상 코드
등급 등급종류 제품별 밴드수 및 색상 a 길이 포함  1.8m 커플링 색상
      전체 커플링 밴드 비, 씨
1 2 3 4 5
H40 제조사 선택에 따라 없음 또는 검은색 띠 없음 파이프와 동일
J55 튜빙 밝은 녹색 1개 밝은 녹색 없음
J55 케이싱 밝은 녹색 1개 밝은 녹색 화이트 1개
K55 밝은 녹색 2개 밝은 녹색 없음
N80 1 레드 1개 레드 없음
N80 질문 빨간색 하나, 밝은 녹색 하나 레드 그린
R95 브라운 1개 브라운 없음
L80 1 빨간색 하나, 갈색 하나 레드 브라운 1개
L80 9Cr 빨간색 1개, 갈색 1개, 노란색 2개 없음 노란색 2개
L80 13Cr 빨간색 하나, 갈색 하나, 노란색 하나 없음 옐로우 1개
C90 1 보라색 1개 보라색 없음
T95 1 실버 1개 실버 없음
C110 흰색 1개, 갈색 2개 화이트 브라운 2개
P110 화이트 1개 화이트 없음
Q125 1 오렌지 1개 오렌지 없음
a 커플링 자재의 경우 구매계약서에 별도의 규정이 없는 한 제조사 내부 요구사항에 따릅니다.
b 특수 틈새 커플링에도 검은색 띠가 있어야 합니다.
c 씰링 커플링에도 파란색 밴드가 있어야 합니다.

6. 케이싱을 원하는 위치에 놓고 수평계를 사용하여 수평이 맞는지 확인하세요.
7. 드릴과 망치를 사용하여 케이싱을 제자리에 고정합니다.
8. 렌치를 사용하여 나사를 조입니다.
9. 우물을 사용하기 전에 시멘트를 24시간 동안 건조시키십시오.
오일 튜브 중국 고급 도매업자, 케이싱 파이프 중국 좋은 회사,
10 PVC BE WELL CASING SCH 40을 설치하는 것은 우물을 안전하게 보호할 수 있는 좋은 방법입니다. 그리고 안전합니다. 올바른 도구와 재료를 사용하면 이 케이스를 즉시 쉽게 설치할 수 있습니다. 그러니 더 이상 기다리지 말고 오늘 프로젝트를 시작하고 우물이 안전하다는 사실을 알고 마음의 평화를 누리세요.

10″ PVC BE WELL CASING SCH 40을 Well Casing에 사용하는 장점

{:}

Similar Posts